
We self-perform the high-risk scopes our clients care most about and bring an integrated construction management team that coordinates trades, manages submittals, and produces the documentation regulators expect.
Whether the project is a planned expansion or an active-site emergency, our crews mobilize quickly and finish what they start.
Vertical wells, horizontal collectors, early collection systems, sumps, headers, and tie-ins on active landfills.
Flare installation, blower skid sets, control panel upgrades, and fuel/condensate piping.
Forcemains, tanks, pumps, drop-out pots, dewatering systems, slope-stability support systems, pre-treatment and treatment facilities, and truck loadout facilities.
Earthwork, access roads, slope work, drainage, and site restoration.
Process piping, pumps, instrumentation, power distribution, and PLC/SCADA tie-ins.
U.S. and India shops fabricate flare, blower, dehydration, and BEST™ gas-upgrading skids.
Work plans that minimize flare downtime and maintain compliance during construction.
24/7 mobilization for fire recovery, well failures, and regulator-driven repairs.
Engineered solutions and field implementation to stabilize and monitor slope movement.

Red-lines, commissioning records, and equipment tag lists flow into OMai as construction progresses — turnover to operations arrives as a warm baseline, not a binder of PDFs.
Explore OMai™